The particular requirements of this project, a roof construction for a salt condensation system, presented us with great challenges, as the elements for the Light-RTM process had extraordinary dimensions, with a length of 4 meters and a density of 125 mm. However, we have managed to complete this project in a record time of just 3 months.
An additional challenge was determining the roof construction for use in the Middle East. Here we had to ensure that the construction would not only withstand the impact of the chemicals inside the installation, but also be able to withstand the extreme weather conditions in this region. This required special care for materials that would be durable to these particular challenges and provide the safety and performance required for this particular application in the Middle East. Our expertise in the production of fiber-reinforced plastic materials and our commitment to innovative solutions have allowed us to meet these challenges and offer a high-quality product.